Capital Projects
McBride Street and Fifth Avenue Water and Sewer upgrades
In March 2024, a significant watermain break in the 2200 Block of Fifth Avenue exposed multiple failing water valves, which prolonged service disruptions and expanded impacts across Shaver’s Bench and Miral Heights. The City has advanced a coordinated infrastructure renewal project, including the installation of new valves, and expanded the project scope to address both aging water and sanitary sewer systems. These upgrades will:
1200 Block Dewdney AveNue rebuild
This project was initiated by stormwater runoff and drainage issues, resulting in water from the lane infiltrating the adjacent underground parkade. The City took this opportunity to improve and replace the aging infrastructure in the lane at the same time as correcting the water issue in the parkade. The project scope includes new water, sanitary sewer, and storm sewer connections with improved lane grading along the 1200 Block to ensure surface water is properly managed.