The portion of Glover Road from Green Avenue to Victoria Street (the highway) will be temporarily closed starting at noon today, Monday, May 16, for road repairs. See the construction area on the included map. Traffic can detour through the upper portion of Glover Road and along Binns Avenue in the interim. The sidewalk in the construction area will also be closed. Pedestrians can access the crosswalk to the adjacent covered stairway.
Thank you for your cooperation and patience.
Please direct questions to the City of Trail’s Public Works Department
250-364-0840
email
Contact Us